Power Plant Land Development
Land Development: Power Plant The project initially specified straw blankets. Hunter Webster from East Coast Green, a Pennsylvania based land contractor, was able to have the specifications changed to Soil Guard. General Information Location -- South Bend, Pennsylvania. All slopes had top soil from the site applied, and then were tracked with a dozer. Soil Guard was applied at a rate of 3,000 - 3800 pounds pre acre. Application took 45 minutes. Weather Conditions - Normal Summer Temperatures 79-84 Results - Excellent germination over the entire project within 2 - 3 weeks |