|
Case Histories
Army Corps of Engineers
Bonneville Dam Fish Slide:
Read more...
Portland, OR The U.S. Army Corps of Engineers awarded a construction contract worth nearly $32 million to build a corner collector surface flow bypass system at the Bonneville Lock.
Roadside Revegetation: Michigan DOT
This is a Michigan DOT project on I96 West Lansing.
Read more...
Roadside Revegetation: Minnesota DOT
This is a MN DOT project on HWY 169, south of Grand Rapids, MN.
Read more...
Roadside Revegetation: Idaho DOT
This is a DOT project to widen Interstate 90 overpass that leads to Lake Coeur d'Alene.
Read more...
USFHA/DOT Product Evaluation: Interstate 5, Vancouver WA
This is a joint product evaluation for erosion control by the U.S. Federal Highway Administration and the Washington State Department of Transportation.
Read more...
Auburn/Black Diamond Road WA
WA DOT Contract 4354
Read more...
This is a DOT project to widen SR-18 to four lanes from Auburn to I-90, approximately 25 miles.
Allyn Curves: WA DOT Contract 4315
This is a DOT project to construct a four-lane highway section approximately one mile long to bypass an old section of highway that has been slumping for many years.
Read more...
Erosion Control Project: Michigan DOT
M-Dot "test area": Soil Guard was applied next to straw blankets. The area received over 1" of rain 48 hours after application.
Read more...
Waterway Stabilization on Golf Course
Stabilize and establish vegetation on bank of Intercoastal
Read more...
Vaquero Golf Course
This project consisted of using Sprig Guarding (a new technique or approach to applying sprigs and establishing native grasses) and Soil Guard (to stabilize bunkers).
Read more...
more info
Green Monkey Golf Course
This project used Soil Guard to overcome difficulties during the grow-in period due to watering problems and extremely high percolation rates.
Read more...
Home Depot: Federal Way, WA
This is a 1.2 acre application of Soil Guard® done around the new Home Depot store in Federal Way, WA.
Read more...
Stream Bank Stabilization Project: Chehalis, WA
This project was a Lewis County Water Conservation District job to stabilize the banks of a small stream in a pasture found to support salmon fingerling.
Read more...
Power Plant Land Development
The project initially specified straw blankets. Hunter Webster was able to have the specifications changed to Soil Guard.
Read more...
Soil Guard® Bonded Fiber Matrix
The Seattle area experienced a heavy rain event on Friday, October 8, 1999. The developer, Conner Homes chose to use Soil Guard on the bases of each home pad, instead of straw and tack.
Read more...
Stream Bank Restoration
New property owners decided to clean up a dry streambed to return the stream to its natural state.
Read more...
Non Vegetative Application
Soil Guard Bonded Fiber Matrix was applied at a rate of 3,000 lbs per acre to keep soil runoff to a minimum while cutting out a mountain and building a wall.
Read more...
Bluffs Housing Development
The Bluffs Housing Development site was having erosion problems on an area with highly erodible soil.
Read more...
Commercial Restoration
Washout conditions existed around a 9 1/2 acre drain field, located off a major highway.
Read more...
|